Rivetira
Book a line assessment

70 stations. Eight programs. One measured claim each.

Every customer below agreed a baseline in writing before go-live. The result column is what actually moved, measured on the same stations, against the same structures.

Stations live

70

▲ +46% increase across 8 programs

Holes inspected

4.2M

▲ +61% increase trailing 12 months

Median RFT gain

+7.1 pts

structural joins

Renewal rate

100%

no churn to date

Airframes assembled on Rivetira across commercial, defense, business-jet, eVTOL and space-structure programs: 8 factories, 70 assembly stations.

Meridian Aerostructures Calder Aviation Group Northvane Defense Solstice Jets Helion Air Mobility Orbital Frame Systems

Who is running Rivetira, and on what

Filter by segment. Every row is a live production deployment with a signed baseline.

8 of 8 rows shown.

Rivetira production deployments
Meridian Aerostructures Tier-1 aerostructures Narrowbody wing box 14 −64% shim hours
Calder Aviation Group Commercial OEM Single-aisle final assembly 22 +38% rate
Northvane Defense Defense prime Tactical airlifter 9 −71% escapes
Solstice Jets Business jet OEM Super-midsize fuselage 7 −49% rework
Helion Air Mobility eVTOL Composite airframe 5 +2.4× throughput
Orbital Frame Systems Space structures Launch vehicle barrel 4 −58% cycle time
Aeris Composites Tier-1 aerostructures Empennage assemblies 6 99.6% RFT
Trellis Airframe Works Tier-2 supplier Fuselage panels 3 −41% FOD events
Total8 programs70

Stations under management, by segment

Stations under management by customer segmentEach segment is labelled directly as well as coloured.
Stations under management by customer segment
SegmentShare
Tier-1 aerostructures20
Commercial OEM22
Defense prime9
Business jet OEM7
eVTOL5
Space structures4
Tier-2 supplier3
020406080StationsQ1 24Q2 24Q3 24Q4 24Q1 25Q2 25Q3 25Q4 25Stations liveClosed-loop stations
Stations live and stations operating closed loop, by quarterA station only counts as closed loop once it has passed twin-gated promotion and been signed off by site engineering.
Stations live and stations operating closed loop, by quarter
QuarterStations liveClosed-loop stations
Q1 2430
Q2 2471
Q3 24143
Q4 24228
Q1 253114
Q2 254423
Q3 255834
Q4 257047

What moved, across every deployment

  • Under nominal
  • On nominal
  • Over nominal
-75.0%-37.5%0.0%+37.5%+75.0%Shim hours per join-57.0%Rework hours per airframe-44.0%Escapes to next station-52.0%FOD events per month-68.0%Join cycle time-39.0%Right-first-time+7.1%Takt adherence+9.4%Delivered rate+21.0%Change vs baseline (%)
Median change across all deployments, percent versus signed baselineReductions are shown as negative. Right-first-time and takt adherence are percentage-point changes, not percent changes.
Median change across all deployments, percent versus signed baseline
Measurement pointChange vs baseline (%)
Shim hours per join-57.0%
Rework hours per airframe-44.0%
Escapes to next station-52.0%
FOD events per month-68.0%
Join cycle time-39.0%
Right-first-time+7.1%
Takt adherence+9.4%
Delivered rate+21.0%

In their words

“We stopped arguing about whether the gap was 0.4 or 0.6 millimetres. The twin predicted it, the shim came off the machine right, and the join closed in one pass.”

Dana WhitlockDirector of Wing Operations, Meridian Aerostructures

−64% shim hours per join

“The rate ramp was going to cost us four more positions. Instead the line rebalanced itself every shift and we found the capacity inside the stations we already had.”

Marcus AdeyemiPlant Director, Final Assembly, Calder Aviation Group

+38% delivered rate

“Every hole is now inspected, not one in four. My airworthiness record writes itself, and I can hand an auditor a complete trace in ninety seconds.”

Priya RaghunathanChief Quality & Airworthiness Engineer, Northvane Defense

100% inspection coverage

Three deployments in detail

How long each deployment took to reach closed loop

Later deployments are faster, because model families, connectors and tolerance studies carry across programs.

0 months5 months10 months15 monthsMeridian Aerostructures9.5 monthsCalder Aviation Group8.0 monthsNorthvane Defense11.0 monthsSolstice Jets6.5 monthsHelion Air Mobility5.0 monthsOrbital Frame Systems6.0 monthsAeris Composites4.5 monthsTrellis Airframe Works4.0 monthsMonths to closed loop
Months from kickoff to first closed-loop stationOrdered by deployment start date. Air-gapped defense deployments carry additional accreditation time.
Months from kickoff to first closed-loop station
CustomerMonths to closed loop
Meridian Aerostructures9.5 months
Calder Aviation Group8.0 months
Northvane Defense11.0 months
Solstice Jets6.5 months
Helion Air Mobility5.0 months
Orbital Frame Systems6.0 months
Aeris Composites4.5 months
Trellis Airframe Works4.0 months

Every station, every structure, one record

Sort any column. The same table backs the audit export an airworthiness engineer hands to a regulator.

Assembly station performance, trailing 30 days
FA-01 · Fuselage section joinSection 41/4399.2%0.041 mm18 h96.4%
FA-02 · Wing-body joinWing box98.6%0.062 mm31 h94.1%
FA-03 · Empennage attachVertical/horizontal99.5%0.028 mm9 h98.2%
FA-04 · Systems installationHydraulics/electrical97.8%0.055 mm12 h95.8%
FA-05 · Final assemblyInteriors/doors98.9%0.037 mm6 h96.9%
WG-11 · Wing skin-to-sparLower skin99.1%0.033 mm22 h97.4%
WG-12 · Wing skin-to-sparUpper skin98.4%0.048 mm26 h95.2%
FS-21 · Fuselage panelBarrel section99.3%0.030 mm11 h97.9%

Assembly autonomy, measured on the line

Every figure below is produced by the same telemetry the agents act on — station cycle, hole quality, gap field, fastener state and conformance. Pilot and design-partner aggregate, trailing 12 months.

Holes drilled under agent control

41.6M

▲ +32% increase cumulative, all lines

Right-first-time, structural joins

97.9%

▲ +9.1% increase vs 88.8% baseline

Shim hours removed per join

68%

▼ -68% decrease 96 h → 31 h

Assembly-line uptime

99.94%

▲ +0.3% increase edge runtime, trailing 90 d

Aggregate across design-partner lines. Baselines are the same stations before Rivetira, measured over an equivalent period.

Three people, three questions, one system

Plant / Operations Director

Owns rate, quality, rework and airworthiness.

“Can I hold takt through the ramp without adding positions?”

Sees: Rate, takt adherence, travelled work, overtime, cost per airframe.

Manufacturing / Liaison Engineer

Owns drilling programs, shimming, fit-up and assembly quality.

“Will this join close in one pass, and what shim do I machine?”

Sees: Predicted gap field, shim geometry, drilling programs, fit-up iterations.

Quality / Airworthiness Engineer

Owns AS9100, hole and fastener conformance and traceability.

“Can I prove every fastener on this airframe was installed to spec?”

Sees: Conformance, NCR flow, FOD events, immutable trace, audit export.

Reads and writes back to the machines you already own

Rivetira is not a rip-and-replace. It connects to the drilling machines, crawlers, trackers, shim cells, sealant robots and MES already on your floor over APIs and OT protocols.

Drilling & fastening

  • Flex-track crawlers
  • Gantry drilling machines
  • C-frame riveters
  • Automated fastening cells
  • Hand-fed ADUs

Metrology

  • Laser trackers
  • Photogrammetry rigs
  • Structured-light scanners
  • iGPS / indoor GPS
  • Articulated arm CMMs

Shimming & sealing

  • 5-axis shim machining
  • Liquid shim dispense
  • Sealant robots
  • Cure monitoring
  • Bead inspection

Factory systems

  • Assembly MES
  • PLM / as-designed models
  • ERP work orders
  • Quality / NCR systems
  • Historians & OPC UA

OPC UA, MTConnect, MQTT, ROS 2, REST and file-drop connectors. Read-only shadow mode first; write-back enabled only after twin validation.

Questions engineers actually ask

Anything else goes to the people who build it. Ask an assembly engineer or read the full FAQ.

Yes, after a line assessment. References are matched by segment and structure type, so a defense prime speaks to a defense prime. Some programs cannot be named publicly; those references are arranged under NDA.

No result is guaranteed, and any vendor who guarantees one is not measuring honestly. What we do offer is outcome-based commercial terms: if the agreed metric does not move against the agreed baseline, we do not earn that portion of the fee.

Because the deployment base is still small and young — eight programs over eight quarters. It is an honest number, not a durable one. Ask us again at fifty programs.

Join the deployment list

A line assessment maps one station, quantifies the rework, shim and rate opportunity, and returns a modelled ROI in three weeks. No production disruption.