Rivetira
Book a line assessment

One cell, one factory, or every site you build airframes in

The same platform, deployed at three scopes. Land where the return is provable, expand as autonomy is earned, standardise when the program demands it.

050100150200Stations1Cell46Factory184Enterprise
Typical station coverage by deployment scopeEnterprise figure is a representative four-site airframe program.
Typical station coverage by deployment scope
Deployment scopeStations covered
Cell1
Factory46
Enterprise184

Rivetira Cell

One assembly cell or station, one workflow, one agent. The wedge that proves the return before anyone signs a factory commitment.

  • Pick your wedge: drilling and fastening control, metrology and predictive shimming, or inspection AI
  • Factory edge runtime sized for one cell, installed alongside the existing machine controller
  • Full hole, countersink, fastener, gap and FOD sensing on that station
  • Dashboard, alerting and write-back into the machine and the MES
  • Assurance-grade audit log from day one, even in shadow mode

$16,000 per assembly cell or station, per month. Typical payback 2–4 months.

$0k$200k$400k$600k$800k$1,000kCumulative ($k)Wk 0Wk 4Wk 8Wk 12Wk 16Wk 20Wk 24Cumulative value ($k)Cumulative cost ($k)
Cumulative value against cumulative cost, single drilling cellIllustrative single-cell model based on a design-partner wing-skin station. Crossover at week 8.
Cumulative value against cumulative cost, single drilling cell
Week since installCumulative value ($k)Cumulative cost ($k)
Wk 0$0k$0k
Wk 4$41k$15k
Wk 8$128k$30k
Wk 12$264k$45k
Wk 16$438k$59k
Wk 20$651k$74k
Wk 24$902k$89k

Rivetira Factory

The whole loop across the plant: all seven agents, the as-built twin, line balancing and robotic handling — one record for every airframe that leaves the building.

  • All seven agents across every station in the factory
  • As-built assembly digital twin: hit fit, quality and takt before the join
  • Moving- and pulse-line station balancing with takt-breach prediction
  • Robotic large-structure handling supervision across crawlers, AGVs and cranes
  • Quality, NCR and airworthiness traceability with sub-90-second audit export
  • 99.9% uptime SLA and managed edge fleet

$100,000 per month. Typical scope 30–60 stations.

01020304050StationsMonth 1Month 3Month 6Month 9Month 12
Stations by autonomy level over the first year of a factory deploymentPromotion is per station and per agent, gated on measured accuracy plus twin agreement.
Stations by autonomy level over the first year of a factory deployment
Month since go-liveClosed loopSupervisedAdvisoryShadowTotal
Month 10064046
Month 348181646
Month 6141612446
Month 926145146
Month 123483146

Rivetira Enterprise

For aircraft OEMs and tier-1 aerostructures suppliers standardising assembly across every site and every program.

  • Multi-site deployment with a central model registry and per-site promotion gates
  • Custom program, structure, material and tolerance models
  • Managed factory edge fleet, including air-gapped sites
  • ITAR and export-controlled program support with US-person access controls
  • Outcome-based commercial components on rate, rework, shim time and right-first-time
  • Named assembly-autonomy engineering team and joint roadmap

Custom pricing. Typical land $800k–$10M ACV.

  • Performance 94.1%–99.2%
Drill/fastenInspectAlign/shimSeal/joinLine/taktEverett, WA98.9%99.2%98.4%98.1%96.8%Charleston, SC98.2%98.8%97.6%97.4%95.9%Wichita, KS99.1%99.0%98.9%98.2%97.2%Queretaro, MX96.4%97.8%96.1%96.6%94.1%
Agent performance by site and module, multi-site programQueretaro went live most recently and is still promoting stations. Values are printed in every cell.
Agent performance by site and module, multi-site program
StationDrill/fastenInspectAlign/shimSeal/joinLine/takt
Everett, WA98.9%99.2%98.4%98.1%96.8%
Charleston, SC98.2%98.8%97.6%97.4%95.9%
Wichita, KS99.1%99.0%98.9%98.2%97.2%
Queretaro, MX96.4%97.8%96.1%96.6%94.1%

What is included at each scope

Capability by product scope
CapabilityCellFactoryEnterprise
Drilling & fastening controlOne workflowAll stationsAll sites
Hole, fastener, gap & FOD inspectionOne workflowAll stationsAll sites
Metrology alignment & predictive shimmingOne workflowIncludedIncluded
Sealant & join sequencing—IncludedIncluded
Line balancing & takt optimisation—IncludedIncluded
Robotic large-structure handling—IncludedIncluded
As-built assembly digital twinRead-onlyFullFull, multi-program
Custom program & tolerance models—Standard libraryCustom
Edge fleet managementSingle nodeFactory fleetMulti-site fleet
Air-gapped / ITAR deploymentOn requestAvailableStandard
Uptime SLABest effort99.9%Custom
Outcome-based pricing components—AvailableStandard

Every product runs the same seven agents

Each agent owns one part of the structural build. They share one perception layer, one as-built twin and one conformance record, so a decision made at the drill is visible at the join.

Drill & Fasten

Adaptive control of drilling, countersinking and rivet/bolt installation.

Holes controlled / shift 18,400 · Countersink depth σ 0.011 mm · Adaptive feed decisions/s 240

Hole & Fastener Inspection

Vision + in-process metrology sensing of hole, countersink, fastener, gap and FOD.

Detection recall (FOD) 99.1% · Flushness resolution ±0.008 mm · Inference latency p99 38 ms

Align & Shim

Metrology-assisted alignment and predictive shimming that removes hand-fit loops.

Gap prediction MAE 0.031 mm · Shim iterations 1.0 (from 3.4) · Alignment cycle 22 min

Seal & Join

Sealant application control and fuselage / wing-body join sequencing.

Bead width CV 4.2% · Sealant waste −37% · Join sequence steps 1,180

Line & Takt

Moving- and pulse-line station balancing, takt optimisation and travelled-work control.

Stations balanced 46 · Takt breach warning 4.2 h ahead · Travelled work −44%

Robot & Handling

Crawlers, AGVs, positioners and cranes moving and holding large structures.

Fail-safe stop <40 ms · Crawler positioning ±0.05 mm · Handling events/day 2,900

Quality & Conformance

Right-first-time, non-conformance, rework and full airworthiness traceability.

Traced actions/day 1.4M · NCR cycle time −52% · Audit export < 90 s

Hit the fit before the join

Every airframe diverges from CAD the moment the first hole is drilled. The as-built twin models that divergence — fit, gap, shim, drilling and structural conformance — and simulates the join before a single fastener is installed.

  • Simulates fit, gap field and shim geometry against the real as-built structure, not the as-designed model
  • Gates every autonomy promotion: an agent only takes a step in the plant after it takes it in the twin
  • Predicts tolerance stack-up across the whole join sequence, not point by point
  • Replays any historical join for root-cause analysis and airworthiness investigation
0.0 mm0.2 mm0.4 mm0.6 mmPeak gap (mm)Section 41Section 43Section 44Wing box LWing box REmpennage
Twin-predicted vs measured peak gap, six major joinsMean absolute error 0.031 mm across 1,900 modelled joins.
Twin-predicted vs measured peak gap, six major joins
StructureTwin predictionMeasured as-built
Section 410.31 mm0.34 mm
Section 430.44 mm0.41 mm
Section 440.28 mm0.30 mm
Wing box L0.52 mm0.55 mm
Wing box R0.49 mm0.47 mm
Empennage0.22 mm0.24 mm

Where the money actually comes back

Rivetira is priced on the metric it moves. This is the value stack from a representative 14-station wing-box deployment.

$0M$2M$4M$6MShim labour removed$4.9MRework hours avoided$3.6MRate capacity unlocked$3.1MScrap & escapes avoided$2.2MOvertime reduction$1.4MInspection labour$0.9MAnnualised value (USD)
Annualised value by source, 14-station wing-box deploymentAgainst $2.7M annual platform cost at Cell pricing across 14 stations. Illustrative model — your line assessment produces your numbers.
Annualised value by source, 14-station wing-box deployment
Value sourceAnnualised value (USD)
Shim labour removed$4.9M
Rework hours avoided$3.6M
Rate capacity unlocked$3.1M
Scrap & escapes avoided$2.2M
Overtime reduction$1.4M
Inspection labour$0.9M

Annualised value

$16.1M

14 stations

Platform cost

$2.7M

Cell pricing, annual prepay

Payback period

2.4 mo

from first closed-loop station

Net revenue retention

136%

▲ +36% increase expansion by station and module

Shadow first. Autonomy is earned, not switched on.

Every agent starts by watching. It is promoted only when its measured accuracy clears the mechanic-plus-metrology baseline and the twin agrees.

  1. Weeks 1–4

    Shadow

    Agent observes the station, predicts every outcome, actuates nothing. Accuracy measured against what the mechanics actually do.

  2. Weeks 4–10

    Advisory

    Agent recommends feed, shim geometry and sequence. A human accepts or rejects; every rejection becomes training data.

  3. Weeks 10–20

    Supervised

    Agent actuates with a human in the loop and a live fail-safe stop. Airworthiness-critical dispositions still require sign-off.

  4. Week 20+

    Closed loop

    Agent runs the step. Humans handle exceptions and the twin gates any change to the control policy.

87.5%90.0%92.5%95.0%97.5%100.0%Prediction accuracyWk 2Wk 4Wk 6Wk 8Wk 10Wk 12Wk 16Wk 20Wk 24promotion gateAgent accuracyMechanic + metrology baseline
Agent accuracy against the human baseline during shadow and advisory phasesPromotion to supervised autonomy requires four consecutive weeks above baseline plus twin agreement. The value axis is truncated to resolve the crossover.
Agent accuracy against the human baseline during shadow and advisory phases
WeekAgent accuracyMechanic + metrology baseline
Wk 288.2%94.1%
Wk 491.4%94.0%
Wk 693.6%94.2%
Wk 895.2%94.1%
Wk 1096.4%94.3%
Wk 1297.1%94.2%
Wk 1697.8%94.1%
Wk 2098.3%94.2%
Wk 2498.6%94.3%

Reads and writes back to the machines you already own

Rivetira is not a rip-and-replace. It connects to the drilling machines, crawlers, trackers, shim cells, sealant robots and MES already on your floor over APIs and OT protocols.

Drilling & fastening

  • Flex-track crawlers
  • Gantry drilling machines
  • C-frame riveters
  • Automated fastening cells
  • Hand-fed ADUs

Metrology

  • Laser trackers
  • Photogrammetry rigs
  • Structured-light scanners
  • iGPS / indoor GPS
  • Articulated arm CMMs

Shimming & sealing

  • 5-axis shim machining
  • Liquid shim dispense
  • Sealant robots
  • Cure monitoring
  • Bead inspection

Factory systems

  • Assembly MES
  • PLM / as-designed models
  • ERP work orders
  • Quality / NCR systems
  • Historians & OPC UA

OPC UA, MTConnect, MQTT, ROS 2, REST and file-drop connectors. Read-only shadow mode first; write-back enabled only after twin validation.

What changes on the floor

Plant directors, liaison engineers and airworthiness leads on what autonomy did to their numbers.

“We stopped arguing about whether the gap was 0.4 or 0.6 millimetres. The twin predicted it, the shim came off the machine right, and the join closed in one pass.”

Dana WhitlockDirector of Wing Operations, Meridian Aerostructures

−64% shim hours per join

“The rate ramp was going to cost us four more positions. Instead the line rebalanced itself every shift and we found the capacity inside the stations we already had.”

Marcus AdeyemiPlant Director, Final Assembly, Calder Aviation Group

+38% delivered rate

“Every hole is now inspected, not one in four. My airworthiness record writes itself, and I can hand an auditor a complete trace in ninety seconds.”

Priya RaghunathanChief Quality & Airworthiness Engineer, Northvane Defense

100% inspection coverage

Questions engineers actually ask

Anything else goes to the people who build it. Ask an assembly engineer or read the full FAQ.

Yes. Cell subscriptions convert into Factory at any point, with the accrued term credited. Expansion is the intended path — most design partners reach Factory scope within nine to fifteen months.

Cell is twelve months. Factory is typically twenty-four with an annual prepay discount of 15–20%. Enterprise agreements are multi-year with usage ramps.

A factory edge node per cell or per line, plus any sensing not already installed — typically cameras and in-process metrology. Existing trackers, crawlers, drills and shim cells are reused. The line assessment specifies exactly what is required.

A Rivetira deployment engineer works on site with your manufacturing engineering team, or with one of our integration partners. First shadow data typically lands within two weeks of the edge node arriving.

Pick the scope that matches your risk appetite

A line assessment maps one station, quantifies the rework, shim and rate opportunity, and returns a modelled ROI in three weeks. No production disruption.